Enugu Section II, KM 28+000 – 56+000 · 2017
Enugu–Umuahia Dual Carriageway Silt Control
Construction of vegetation and silt control works on the median and verges of the Enugu–Umuahia dual carriageway, Section II (contract number VCFHN/O8-ENO2), delivered for FERMA to protect the highway drainage regime.
Boranti provided Civil Engineering Construction services from concept through construction administration.
- Client
- Federal Roads Maintenance Agency (FERMA)
- Architect
- Boranti Nig. Ltd.
- Size / value
- Contract value ₦15.1m · completed
- Completed
- 2017
Related services