Boranti
Enugu–Umuahia Dual Carriageway Silt Control

Enugu Section II, KM 28+000 – 56+000 · 2017

Enugu–Umuahia Dual Carriageway Silt Control

Construction of vegetation and silt control works on the median and verges of the Enugu–Umuahia dual carriageway, Section II (contract number VCFHN/O8-ENO2), delivered for FERMA to protect the highway drainage regime.

Boranti provided Civil Engineering Construction services from concept through construction administration.

Client
Federal Roads Maintenance Agency (FERMA)
Architect
Boranti Nig. Ltd.
Size / value
Contract value ₦15.1m · completed
Completed
2017

Related services