Umuahia North LGA, Abia State · 2018
Umuahia Gully Erosion Control
Construction of gully erosion control measures across Umuahia Metropolis for the Ecological Fund Office of the Presidency. Works included reinforced-concrete drainage channels, chute structures, stilling basins and vegetation reinstatement across the affected catchments.
Boranti provided Civil Engineering Construction services from concept through construction administration.
- Client
- Ecological Fund Office (Presidency)
- Architect
- Boranti Nig. Ltd.
- Size / value
- Contract value ₦219.4m · completed
- Completed
- 2018
Related services